top of page

ENGINEERING CONSTRUCTION

Nowadays, regardless of the project decoration in various industries, with the continuous increase of the quality, the project decoration costs continue to increase. According to data released by the Consumer Council in mid-2015, there were nearly a hundred complaints about renovations received last year, including the inconsistencies in renovation costs, the additional costs of materials used by the renovation masters in the project, and even delays in the completion date. Disputes, even after paying the project fee, the project still failed or was unreasonably charged for the cost of engineering changes outside the contract.

To this day, in every project from design, and material selection to construction, we will consider the affordability of the customer and make an appropriate design plan. We also attach importance to the quality of engineering construction. In addition to looking for an interior design company to propose a design plan, every customer is also looking for trust and quality.

Economic benefit

In the process of each construction site, we must overcome the time schedule and quality, and also consider the cost to produce the impression of the entire finished product. We will take the highest quality management cost and obtain an efficient market as the foundation, grasp the project progress and project quality, and ensure that the project is economical

Rationalization

In addition to following reasonable and practicable management principles for the various procedures of the construction site, we will also use simple design content and rigorous structure to ensure that every detail of the construction site can meet customer requirements

Actual

According to the content and specific conditions of the project, proceed from the actual situation, adjust measures to local conditions, make reasonable arrangements, and focus on the key points to make the construction process more reasonable and feasible

Make good

The construction site environment is different, we will make full use of existing resources, reduce temporary projects, coordinate the schedule of various projects, and ensure the balance and continuity of construction and production

What We provide

bottom of page